Sunday, July 4, 2021

WER At Four Lakes, But...

Courtesy of Blair Kooistra.

Blair says:

"Washington Eastern's "scoot" train unloads its golden bounty into the Four Lakes shuttle facility on September 25, the nearly-untouched former Santa Fe GP30 2422 leading three SD40-2's. Thinking that might have been you, Bruce Butler, watching me fly my drone into the power lines along Craig Road?"

 

But there is more to the story:

"See those wires clearly visible in the photo? Well, apparently I didn't see them, must've thought they were grid lines on the video display. These are the ones I flew into photographing the Washington Eastern near Four Lakes the other day. D'ough! Drone escaped apart from two broken rotor blades (easily replaced) and a scuff mark or two from the wire on the drone's body. . . "

"I’m usually so careful making sure I’m well over power lines and such. Guess not this time. Lazy on my part not walking across the road to watch my clearance—it’s often hard to keep perspective with aerial lines unless your’re under them or parallel them.

"So: Beerzaplhat!! Snagged two rotors and the bird fell 30 feet to the ground—thankfully landing on soft grass. Gimbel good. Rotor arms undamaged. I swapped out 2 new blades for damaged ones, recalibrated the thing and amazingly it seems to fly like it did before. Like I say: I learn something every time I fly—and sometimes have to relearn things.

"In two years of flying, my first accident. And no lasting damage apparently."


 

Saturday, July 3, 2021

1947 Mansfield Depot View

Photo by Henry Gallaher.

A low afternoon sun warns the west face of the Mansfield Depot in the winter of 1947.  The depot had been retired three years prior in 1944; sold and removed in 1961.  According to railroad records, it was used to construct smaller buildings at McCue Siding in Douglas Creek Canyon.  



Thursday, July 1, 2021

 



New Power On The WER

Guest post by Bruce Butler.

April 28, 2021

A lash-up unlikely to be duplicated again on the WER.  Yesterday's (4/28/2021) eastbound scoot train with FIVE units; all running and online.  I was the engineer on the HL28-2 crew with Conductor Kai Longre.  We got the train from the HL28-1 crew (Ted Curphey and Gary Durr) at Telford Rd, which is near MP 57.  Our final destination was the Highline Grain facility at Four Lakes WA, at MP 6.4.  

We had 50+ miles to travel, most at 10 mph,  including a complex pick-up in Davenport, another easy pickup at Mondovi, and a couple of 5 mph slow orders.   As you may imagine, we had our challenges!  The only 20 mph track we encountered was at Geiger Jct, MP 7.9 which didn't do us much good.

Our consist after leaving Mondovi, where we picked up 10 loads:

3910 - SD40-2

7348 - C40-8

3776 - SD40-2

7338 - C40-8

3588 - SD40-2

74 loads, 6 empties, for a total of 80 cars.  The 6 empties were set-out at Elizabeth siding on the Geiger Spur and the 74 loads went to Highline Grain to be unloaded.

Not wishing to have this train "dog caught" (ie running out of time) we elected to do our work in the most expedient and simplest manner.  This resulted in all 5 units running and online.  The 3910 and 7348 were added on the point at Davenport. 

The descent down Deep Creek hill was handled entirely with dynamic brakes in notch 4 or 5.  The climb up Deep Creek was easily achieved in throttle 4 or 5 and staying within the 10 mph speed limits allowed.  It was a full 12 hour shift but we got the train to Highline.  Garrett Wheeler, who was the Engineer unloading this train at Highline assisted us with the Geiger Spur setout and the back-up move into Highline.  His help was much appreciated. 

We got the job done within the 12 hour time limit imposed by the hours-of-service law.  Am I grandstanding?  Perhaps a bit!  I was proud of the job Kai and I did for the railroad.


At Mondovi after making our 10 car pick-up.



At Highline Grain in Four Lakes. Parked east of the unloading shed.



I try to offer good details. Most of our run was at night and Mondovi was the first opportunity to actually get any pictures. I was hoping some other fans might show up but no such luck. Nobody was at the INRM museum when we went by.

Many people do not understand what is involved in changing locomotive consists, and how much time it can take. You have to connect the walkways and their chains. Hook-up the MU cable which can be a P.I.T.A. if you are doing it yourself. Hook-up the 6 (3 on each side) pneumatic MU hoses - yes I know, theoretically you only need one side hooked up, but sometimes you will eliminate problems by hooking up both sides. Then there is the consist test to make sure all locomotive brakes work correctly. The headlight test to insure that the rear unit lights up for back-up moves. The throttle test to make sure all of them rev up and load.

In our case, the 3910 and the 7348 in Davenport were not connected together. So we had to put them together and then add them to the front of the 3776. Another consideration was that the 3588 was the only west facing unit in this consist, so it was desirable to have it on the rear.

Wednesday, June 30, 2021

Wenatchee Centennial Mills View

Photographer unknown. 

No date.

Note the grain loading boxcars on the lower right. Considering the outside braced boxcar, at least before 1970.



Monday, June 28, 2021

BNSF Vs Center Pivot

Occurred at Naylor on April 23, 2021. 

Photographer unknown.

People familiar with this area said "this pivot will go thru the stop and head to the tracks Guess the new farmer didn’t know that."



Sunday, June 27, 2021