From Mainline To Branchline To End Of The Line

Photo date April 19, 2012.

What was once the planned relocation of the Northern Pacific mainline across Washington State, became a backwater branchline that is now out of service. 

Drivers along Interstate 90 east of Moses Lake, WA are often confused by the railroad line that "follows" the road. It was, in fact, the other way around. 

The NP was aware that their mainline was longer than the competing lines of the Milwaukee and the Great Northern, so came up with a plan for a line to branch off their mainline at Ritzville, and run mostly due west to Ellensburg. This would save about 80 miles of running time, instead of dipping south through Pasco and then back north through Yakima. The line was surveyed and grading started at Ritzville and connected into the abuilding Connell Northern branch headed north out of Warden, WA, at a location called Bassett Junction. 

Rail was laid from Bassett to Remple (now called Schrag), when the project stopped. Cold. Why? The opening of the Panama Canal. It would seem that enough traffic disappeared from the otherwise very frugal NP that the project could no longer be justified. 

The NP did look at completing the line a few more times over the years, including a plan to use the Milwaukee grade to Ellensburg. The last internal  correspondence the NP had about this project was about 1951. 

Most traffic on on the branch was from a modest sized grain elevator at Schrag. It was still shipping when Burlington Northern sold off the old Connell Northern branch in 1986 to the Washington Central. Operations continued to be seasonal as ownership changed to the Columbia Basin Railway, after BN bought back the Washington Central, but promptly spun the Connell Northern lines right back out.

In the Columbia Basin era, car supply became dependent on the State of Washington having purchased older hopper cars, and doling them out to a few shortlines, in order to help keep truck traffic off state roads. In the photo you'll see these greenish yellow cars in abundance. 

I'm not so sure the brain-trust who put the state program cars into service thought much about the rule about 50 year old cars being prohibited from interchange service, but that is what seems to have killed off service on this branch. The photo here is from 2012, but in a few short years these cars were parked at Schrag, rusting to the rails, as they were all too old to hand off to the BNSF anymore. 

Those cars sat for about two years before they were rounded up and doled out to other state-owned shortlines for captive use, where they are still today. 

The Columbia Basin Railway ownership has changed recently. All the small power like the pictured GP9s are now long gone, and the branch is being used to store out of service Cryotrans reefers, with the mechanical refrigeration parts removed. There are nearly 100 of these cars out there today.  Is this the end of what was supposed to be a mainline?

Most of this information I plan on using for a program at the upcoming NPRHA convention this year in Toppenish, WA.  



Monday, November 3, 2025

Barham View

Photo courtesy of Lauren Scrafford.

Lauren says:
"Columbia Basin, CBRW 1626 approaching Barham, WA on the Schrag Branch with 26 carloads of grain. This was on August 4, 2000, when the CBRW was fairly new to the Columbia Basin. 

The CBRW is a GP9 rebuild built for the Northern Pacific in August of 1957 as the NP 328. With the Burlington Northern merger, it became BN 1913 and BNSF 1626 with the BNSF merger."



Friday, August 8, 2014

Bassett Jct

I've been meaning to get out into the wilds and see how close the NP and Milwaukee lines were in this area north of Warden. The Northern Pacific, under the guise of the Connell Northern, had built through here with a line from the mainline at Connell to Adrian, where it connected with the Washington Central branch. At Bassett Jct, the Ritzville cutoff started, with the line graded all the way to Ritzville. Tracks were only laid as far as Schrag. Surveys had the line continuing west from Bassett Jct, all the way to Ellensburg.

The Milwaukee branch from the mainline at Warden split at Tiflis. One segment went east to Marcellus, the west segment went to Moses Lake. What the maps show are wyes, and crossovers, all within a small section of land. No lines crossed each other at grade.

The first map is from 1925 and shows a pre Interstate 90 time, while the second map shows a 1980s view, largely unchanged today, showing how the interstate was built just to the north of all these railroad lines.