Tuesday, June 9, 2026
Saturday, January 27, 2024
Monday, September 25, 2023
Hartline Studebaker
Photo courtesy of Lauren Scrafford.
Lauren says:
"WW2 Studebaker US6 2 1/2 ton 6X6 Cargo Truck in use as the railroad car mover at the Hartline, WA Grain CO-OP, on the Eastern Washington Gateway. This was on April 12, 2012 and the Studebaker was about to move Burlington Northern, BN 449196 a loaded covered hopper.
"A collector was able to twist the arm of the Grain Co-op and purchased the Studebaker. Hopefully this has been restored."
Friday, April 14, 2023
2018 Highline Grain Shipping Rates
This was shared with me from one of the owners of the Eastern Washington Gateway back in 2018.
Hi Dan,
Please see the attached BNSF tariff schedules for wheat. 4022-43591 covers the shuttle trains from Four Lakes, McCoy and Templin while 4022-43595 covers all of the singles. The best rate from Ephrata is $2,440 PC (24-47 cars, 286,000 lbs.) vs. the Four Lakes shuttle rate of $1916 PC. Now, there are incentives for unloading and loading ($100 PC, I believe) in less than 10 hours which help reduce the shuttle rate. But, you can see that if the scoot tariff is very high, HLG is incentivized to ship smaller lots from other locations.
Best regards, XXXX
Wednesday, January 11, 2023
Unloading At Highline Grain
Guest post by Bruce Butler.
Yesterday, 1/26/2021, I was assigned to train HG26-1, unloading 72 grain loads brought in by our scoot train. Some breaks in the unloading process gave me the opportunity to shoot some pictures.
We have unloaded about 25 cars and a "lot change" situation gave me some time for outside pictures. This view looks north.
Same spot, but looking North East with the Highline Grain elevator shown on the right.
Another view, looking North East.
Looking
south. The bridge under I-90 is in the distance. The inner loop, used
by BNSF unit trains is on the left and curves to the east. The track
on the far left (note the derail at the very edge of the picture) is a
stub track, mostly used to set out any bad order cars.
Looking east across the stub track at the Highline elevator.
We are at the tail track of the wye and I had to align that switch for the west leg, where my train is sitting, before proceeding. Another "lot change" situation delayed unloading the next car and gave me the time to get the switch without having to pause the unloading activity.
We
have finished unloading this 72 car train and I have pulled forward
enough to clear the unloading shed. This gives the Highline crew the
ability to sweep the floor of stray grain and do their clean-up.
Another view from the same location above. We are right in the switch at Four Lakes, where the Highline spur switches off of the CW main.
For those who might be interested, here is the official WSDOT (Washington Department of Transportation) track plan for the Highline Grain Facility.

































