From the "Spokesman Review."
August 22, 2008
This site features daily historical railroad posts from the Big Bend/Columbia Plateau region of Washington state. As a personal site, this is my online filing cabinet of interesting things I've come across about railroading in the area. Thanks for stopping by! Shoutout to Kirtus Dolorina for stopping by to borrow other people's work!
Showing posts with label Airway Heights. Show all posts
Showing posts with label Airway Heights. Show all posts
Friday, November 29, 2019
Wednesday, August 28, 2019
Rail Work Restricts Traffic On Hwy. 902
Sunday, July 7, 2019
Geiger Spur On Track For Renovation
Wednesday, April 3, 2019
2018 Last Run Of The EWG
Guest post by Rocky Gibbs.
November 3, 2018
3346 - departing the west Spokane industrial park for Cheney with empty cars for BNSF.
3352 - Approaching xxx road crossing on the Geiger Spur.
9910 - 328, train GT-03, going to Cheney crossing Four Lakes to Medical Lake road.
9915 - 328 arriving Cheney.
9925 - same action as 9915.
3366 - at Cheney moving equipment around on various tracks.
3377 - crew with engineer Bruce Butler, and Rodney Aho.
9934 - same action as 3366.
9950 - same action as 3366.
3384 - same action as 3366.
3391 - last loads going to west Spokane industrial park approaching Craig road.
3398 - last loads be shoved to Seaport metals.
3401 - same action as 3398.
9985 - preparing for group employee photo. Employees in safety vests, railfans no vests with two exceptions.
3406 - group employee photo.
L-R: Jerry Miller, Rodney Aho, GM and President Donald Purdie, Engineer Bruce
Butler, VP Operations Scott Nauer, Fredrick Simon, Trainmaster Gary
Durr, and Conductor Scott Rohrig
3413 - photo of the last run crew.
9979 - 328 ready to run back to mainline to spot tanks on Geiger spur with 329 inside fence at Western Rail where 328 would move to by the new company on Nov 5.
3420 - the tanks be re-spotted onto the Geiger spur.
3422 - 328 and tanks spotted on the spur and 328 being shut down. the end of EWG operations.
November 3, 2018
3346 - departing the west Spokane industrial park for Cheney with empty cars for BNSF.
3352 - Approaching xxx road crossing on the Geiger Spur.
9910 - 328, train GT-03, going to Cheney crossing Four Lakes to Medical Lake road.
9915 - 328 arriving Cheney.
9925 - same action as 9915.
3366 - at Cheney moving equipment around on various tracks.
3377 - crew with engineer Bruce Butler, and Rodney Aho.
9934 - same action as 3366.
9950 - same action as 3366.
3384 - same action as 3366.
3391 - last loads going to west Spokane industrial park approaching Craig road.
3398 - last loads be shoved to Seaport metals.
3401 - same action as 3398.
9985 - preparing for group employee photo. Employees in safety vests, railfans no vests with two exceptions.
3406 - group employee photo.
L-R: Jerry Miller, Rodney Aho, GM and President Donald Purdie, Engineer Bruce
Butler, VP Operations Scott Nauer, Fredrick Simon, Trainmaster Gary
Durr, and Conductor Scott Rohrig
3413 - photo of the last run crew.
9979 - 328 ready to run back to mainline to spot tanks on Geiger spur with 329 inside fence at Western Rail where 328 would move to by the new company on Nov 5.
3420 - the tanks be re-spotted onto the Geiger spur.
3422 - 328 and tanks spotted on the spur and 328 being shut down. the end of EWG operations.
Friday, March 22, 2019
2010 Trip To Western Rail
October 7, 2010
We were a bit late to catch the rerailing effort at Cheney, but then we stopped by the Western Rail yard at Airway Heights.
We were a bit late to catch the rerailing effort at Cheney, but then we stopped by the Western Rail yard at Airway Heights.
Tuesday, September 12, 2017
Subscribe to:
Posts (Atom)