From the "Spokesman-Review."
April 12, 1907
Sunday, October 31, 2010
Friday, October 29, 2010
Wednesday, October 27, 2010
Monday, October 25, 2010
Ephrata AFEs
This is a summary to the "Applications For Expenditures" (AFE) files which were project files for all purchases, construction or removal of facilities or equipment from Great Northern property. These files sometimes contain correspondence, invoices, blueprints and other project information, and often contain insight into events or changes in a specific area at a point in time.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
1893 Construct 100x100 stockyard
1898 Extend passing track 531 feet
1899 Construct 700 foot industry track
1900 Replace 2 foot water pipe line with 4 foot
1900 Erect mail crane
1900 Equip mail crane with bag clamp
1900 Grade driveway
1901 Construct temporary stockyard
1901 Place 8 ton standard stock scale at stockyard
1901 Extend industry track 1550 feet
1902 Erect 24x48 station facility
1902 Construct public crossing
1902 Renew water pipe to stockyard
1903 Widen banks on road bed
1903 Install rain gauge and instruments for measuring rainfall
1903 Build an additional 98x99 foot pen to stock yard
1903 Install mail crane
1906 Construct private crossing
1906 Construct standard section house and standard laborer house
1907 Construct passing track
1909 Construct passing track
1909 Move water closet to new location
1909 Change outlet fixture on water tank from 7 inch to 10 inch diameter
1909 Install ROW fence
1910 Move station water closet
1911 Install 5700 feet of ROW fence 2 miles west of Ephrata
1912 Install electric crossing alarm bells at Pacific Ave
1912 Place public crossing 2 1/2miles west
1912 30x52 addition to depot, place flush toilet in each waiting room, rearrange for freight house and warm room, extend platform
1913 Remove stockyard scales
1914 Construct 400 foot extension to industry track for Standard Oil Co.
1914 Replace signals
1914 Construct 1064 foot extension on east end and 400 foot extension on west end of passing track
1914 Move public crossing 250 feet east
1914 Install ROW fence
1915 Install feed racks in stockyards
1915 Install sheep loading chute
1916 Install ROW fence
1916 Deep well and pump
1916 Relay passing track with 85# rail
1916 Pipe connection to city water
1916 Install culvert at bridge 344.1
1917 Install ROW fence
1916 Install culvert at bridge 344.1
1917 Install ROW fence
1917 Cess pool at depot
1918 Pump house for water tank
1919 Replace water tank
1920 Purchase lawn mower
1920 Extend drain from standpipe
1920 Enlarge pump house & replace pump
1920 Pipe from water tank to section house
1921 Bunk houses from Adrian and Columbia River
1921 Move 8x12 hand car house from Quincy to Ephrata
1921 Move 8x12 hand car house from Quincy to Ephrata
1922 Construct public crossings
1922 Bunk house from Circle
1922 Replace motor at pumping plant
1923 Install 11200 feet of ROW fence 4 miles west of Ephrata
1923 Ephrata to Quincy: Relay present 85# rail with new 100# rail from present end of 100# rail at station 6736-22 about 1/2 mile west of west switch Ephrata to west end of 90# rail near west switch Quincy station, a distance of 16 miles, providing 7x10 1/2 inch new tie plates and 5/8x6 inch spikes out of face. Relay rail lighter than 75# with second hand 85# rail in passing tracks at Naylor, Winchester, and Quincy; also tie plate curves in passing tacks with second hand tie plates and relay 68# turnouts with #9 turnouts, using second hand switch material recovered from main line. Provide curve number and elevation boards. Place 13000 cubic yards ballast out of face from Adrian pit charging 40% to capital account, balance to operating expense, provide for track bonding in connection with signal department. Extend passing track at Quincy to connect with east wye switch
1923 Electric lights in depot
1923 Move section house from Chopaka to Ephrata
1923 Move section house from Chopaka to Ephrata
1924 Electric lights in section house
1924 Construct Union Oil spur
1924 Install car body building
1924 Install cut-out for alarm bell
1925 Place oil drums
1925 Connect to city water
1925 Fill bridges 344.1, 344.2 & 362
1925 Fill bridges 344.1, 344.2 & 362
1926 Deepen well
1928 Auxiliary telephone in depot warehouse
1928 Replace 100# passing track switches with 110# material
1929 Extend passing track
1931 Private crossing at Cyrus Ave
1932 Enlarge signal maintainers cottage
1934 Extend public crossing at Pacific Ave
1934 Move gas engine from Lyons to Ephrata pumping plant
1935 Highway underpass
1935 Air compressor for pumping plant
1935 Extend public crossing
1936 Add bedroom to section house
1937 Remove private crossing at Cyrus Ave
1937 Retire bunkhouse
1937 Install bunkhouse from Quincy
1939 Replace engine at pumping plant
1939 Water hose connection
1940 Assessment for sewer
1941 Shingles on roof of depot
1941 Loading platform
1942 Replace pump
1943 Remodel 29x100 station
1943 Sewer pipe
1943 Extend industry track
1943 Turnouts for Army tracks
1943 Grading for west leg of wye
1943 Fit up four 2689' capacity arch bar cars for use as bunk cars to house employees
1943 Fit up four 2689' capacity arch bar cars for use as bunk cars to house employees
1944 Relay through turnouts of passing tracks with 112# rail
1944 Remove mail crane
1945 Install spring switches
1945 Construct tool house
1945 Place derail on lead to Army Air Depot track
1945 Basin Concrete spur
1946 Griswold signals on Division and Third Ave
1946 Sewer line
1947 Assessment for streets-8th
1947 Pave platforms at depot
1947 Remove switch and connect industry tracks
1947 Purchase billing machine
1947 Purchase adding machine
1947 Install toilets in laborers houses
1947 Construct sidewalk on Third Ave
1948 Pave and repair crossings and relay 253 feet main line
1948 Improvements to company house
1948 Install shoo-fly tracks for canal crossing
1948 Install shoo-fly tracks for canal crossing
1949 Morrison-Knudson siding
1949 Remove Union Oil spur
1950 Extend depot platform
1950 Purchase property
1950 Morrison-Knudson spur
1950 Irrigation pipe
1950 Dedicate part of station grounds for road
1950 Dedicate part of station grounds for road
1951 Hand throw at Columbia Concrete Pipe spur
1951 Remove Morrison-Knudson track
1951 Install metal tool houses
1951 Temporary timber bridges Ephrata to Winchester
1952 Construct roadway and fence
1952 Partitions in depot
1952 Easement for street
1952 Retire water tank
1952 Retire water tank
1953 Purchase property
1953 Improve depot platform
1953 General Tractor spur
1954 Sale of property
1954 Midstates Supply spur
1955 Retire & remove stockyards
1955 Crossing gates
1955 Easement for highway
1955 House track
1956 Assessment for sewers
1956 Sun Basin Lumber spur
1956 Signal timing circuits
1957 Easement for BPA
1958 Assessment for streets
1958 Easement for over head highway bridge
1960 Sell section house
1963 Sale of property
1965 Extend loading platform 80 feet
1965 Wheel change truck
1966 CTC Ephrata to Columbia River
1968 Retire stockyard facility
1968 Purchase truck
1970 Install CTC with 4th aspect Lamona to Ephrata
1970 Install CTC with 4th aspect Lamona to Ephrata
Saturday, October 23, 2010
Downs AFEs
This is a summary to the "Applications For Expenditures" (AFE) files which were project files for all purchases, construction or removal of facilities or equipment from Great Northern property. These files sometimes contain correspondence, invoices, blueprints and other project information, and often contain insight into events or changes in a specific area at a point in time.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
1901 Construct 60x160 grain storage warehouse
1901 Rip rap at bridge #310
1902 Construct public crossing
1902 Construct 24x48 station facilities
1902 Extend passing track 3000 feet
1902 Install mail crane
1902 Construct private crossing
1903 Construct sidewalk at station grounds
1904 Install ROW fence
1905 Install ROW fence
1906 Install ROW fence 1/2 mile west
1907 Change switch at yard track
1910 Place culvert 2034 feet west of bridge #310
1913 Install steel at bridge #310
1913 Install steel at bridge #311
1914 Relay 2418 track feet of passing track
1915 Construct private crossing 2 miles west
1918 Install steel mail crane
1919 In passing tracks, relay all rail lighter than 75#, with second hand 80# rail
1920 Tool house destroyed by fire
1921 Retirement of tool house
1921 Move bunk houses from Bluestem & Downs
1924 Construct private crossing
1926 Install ROW fence
1926 Move 24x48 depot to Marlin
1931 Install ROW fence
1931 Remove 2 mail cranes
1940 Install gates in ROW fence
1940 Relocate public crossing from station 3473+82 west and extend 16 feet.
1941 Remove public crossing at station 3479+54
1947 Relay passing track with second hand 100# rail, also secondary tracks
1949 Remove public crossing
1949 Improve drainage at bridge #310
Thursday, October 21, 2010
Douglas AFEs
This is a summary to the "Applications For Expenditures" (AFE) files which were project files for all purchases, construction or removal of facilities or equipment from Great Northern property. These files sometimes contain correspondence, invoices, blueprints and other project information, and often contain insight into events or changes in a specific area at a point in time.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
Douglas
1910 Construct 48x48 one pen stockyard
1912 Construct public highway 1090 feet long
1912 Transfer track to Waterville Railway
1913 Construct road crossing
1917 Install ROW fence
1917 Extend industry track
1919 Install culverts Columbia River to Mansfield
1919 Waterville Railway turnout
1920 Bridges and culverts
1921 Assessment for roads
1923 Repair flood damage
1924 Rip rap
1926 Widen public crossing at Washington St.
1928 Move private crossing
1928 Rip rap Alstown to Douglas
1935 Rip rap
1937 Auto unloading platform
1938 Move public crossing
1938 Repair flood damage
1941 Driveway around depot
1946 Electric lights in depot
1947 2 wire telephone circuit mp 35 to 37
1949 Extend Centennial Mills spur
1950 Repair flood damage
1956 Acquire Waterville Railway tracks
1956 Move section buildings
1960 Well for depot and section
1961 Install culverts
1962 Purchase pick-up truck
Tuesday, October 19, 2010
Difference of Decades Moses Lake Depot
The older photo was taken in 1976, the later photo in 2010. Note the buildings on the very right have not changed, except for paint, and that the siding in the old photo is now the only track. Beyond the grade crossing with Alder Street there is a jog in the tracks where the siding goes to the right and catches up with the main track. In the old photo there is a silver grain building in the background, which is still there, but in the later view is obscured by a tree. The depot sign is in a private collection in town.
The grassy area was a project by the town fathers to beautify the area:
The grassy area was a project by the town fathers to beautify the area:
Sunday, October 17, 2010
Friday, October 15, 2010
Moses Lake Depot
The following is from Allen Miller, regarding operations in Moses Lake, who also supplied the photo:
"I did a little research on Moses Lake (Neppel) depot. The new depot was completed and the agent's job bulletined in December, 1912. H. L. Johnsrud, the first agent at Warden, bid in the new job and opened the station in January, 1913. He didn't stay long and promptly bid in the vacant agency at Kittitas in March and L. G. Graham, from the agency at Ewan, took over the Neppel agency next.
"When the Marcellus and Moses Lake lines were built they were not connected to the main line via telegraph. Messages to and from the branch line agencies had to be relayed by phone through the agency at Warden. This resulted in a lot of extra work for the Warden agent, essentially making it a small scale relay office.
"In March, 1916, repeaters were installed at Warden to connect Marcellus Neppel and Ruff to the main line telegraph. It was said that the boys on the branch were so rusty after several years of not using their Morse skills that their call letters, NP - Neppel, MR - Marcellus and RU - Ruff, had to be sent to them by mail. For the first few weeks there were some strange things heard over the Morse on the branches as the boys struggled to re-aquire their former skills.
"A fish business developed out of the numerous Carp that abounded in Moses Lake. I read in a newspaper article about Elsie Rudloff, wife of the station agent, that the fish were shipped to Jewish rituals in New York City. In September, 1917 there is mention that J. G. Vickers, Milwaukee agent at Warden, was in Neppel looking after the fish business. In April, 1919 there is another mention that fish were now moving from Neppel to eastern markets. Again, in June, 1919 Agent Vickers was again in Neppel looking after his fishing interests.
"Emil E. Rudloff, formerly the original agent at Ralston, became the agent at Neppel around 1920-21 I believe. Next was Frank M. Sever. He was there as early as August, 1943 when the accident happened to the troop train at Warden. George LaValley was agent in the 1950's and '60's and I have attached a scan of a train order he copied there in 1954. This is the only order I am aware of from Moses Lake. I once had two copies, but traded one set to Ken Secrest, of Kalispell, Montana.
"The last agent was Marv B. Williamson, there by 1970 and until the station was closed."
Subscribe to: