Courtesy of the Coulee Pioneer Museum
April 3, 1972
This was the time of the building of the third powerhouse at Grand Coulee Dam. Bulk cement was brought int by railroad car, and then unloaded into trucks for the final 30 mile move to the construction site at the dam.
This unloading site was built for this purpose, as there had not been a siding of any sort here prior.
No comments:
Post a Comment