Images courtesy of Darrin Nelson.
He says:
"These blueprints are from Great Northern Railway’s Engineer/Right-of-way Drawings. These were the original drawings submitted by GNRY to Douglas County and Certified by the State of Washington for start of construction. The following sample prints show all the locations of the bridge trestles within these documents. The date on these documents is 1908, but ROW acquisition began as early as 1906. These Documents have been residing in the courthouse vault for the last 100 years."
Bridge 2
Bridge 3 and 4
Bridge 5 and 6
Bridge 7
Bridge 9
Bridge 10
Bridge 11
Bridge 12 and 13
Bridge 14 to 17
No comments:
Post a Comment