As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
1902 Add derail to yard track
1903 Widen road bed bank
1905 Construct interchange track
1905 Line change
1906 Install 287' spur
1906 Install 287' spur
1907 Relay yard track
1907 Install ROW fence
1908 Extend industry spur 50 feet
1910 Construct 12x50 cinder platform
1912 Relay 14.064 miles between Crater and Columbia River with 90# rail
1915 Move watchmens shack to Malaga
1915 Move watchmens shack to Malaga
1917 Remove loose rocks
1917 Install privy
1918 Remove privy
1918 Extend passing track on both ends
1922 Install culverts
1923 Crater to Wenatchee: Replace 22000 steel tie plates with 7x10 1/2 inch plates on renewal ties that are to be place this season
1924 Crater to Trinidad: Relay present 90# rail with new 130# rail in curve 437 east of Trinidad, length of track to be relayed is 2900 feet
1924 Place 5250 grip rail anchors
1925 Relay curves with 130# rail
1925 Galvanized arch in Tunnel 11.1
1928 Crater to Columbia River: Relay with 90# second hand rail approx 2250 fee of passing track replacing 75/87 rail
1928 Line change
1929 Crater to Columbia River: Relay with new 110# rail approx 13.7 miles of 90# rail, replacing grip rail anchors, tie plates, spikes, providing washed gravel, ballast, and bank widening
1932 Relocate four pump type extinguishers from Grand Forks for use in tunnel 11.1.
1939 Repair tunnel lining
1940 From Teton to Crater relay main track using second hand 90# rail, 17.995 mile of track and 10 turnouts
1940 Crater to Quincy: Relay with 112# rail
1943 Retire pump
1946 Crater to Columbia River and Trinidad: in 110-112# rail place 19280 grip rail anchors
1950 Crater to Columbia River: Install tie plates
1953 Relay 1.81 mile of main line with 115# rail, provide new spikes for track and reuse old to tie down tie plates
1953 Install irrigation pipe
1953 Slide fence at curve 434
1954 Relay with 115# rail
1954 Remove part of passing track
1955 Relay 6.2 miles of main line with 115# rail, furnish new track spikes and reuse second hand track spikes, place 32 rail anchors per panel of track from Crater to Columbia River
1957 Remove west switch, spur, and part of siding
1958 Sale of easement to BPA
1964 Remove remainder of 1138 foot siding