As a summary, it does give a look into the changes made over the years.
From the GN-NP Archives.
1899 Install passing track and rearrange station grounds
1900 Install cattle guard in ROW fence
1901 Construct bridge
1901 Construct industry track
1901 Construct warehouse
1902 Install ROW fence
1902 Construct industry track
1902 Take up side track, move water tower, move temporary depot east
1903 Construct spur track
1903 Build ROW fence to Downs
1903 Construct temporary spur
1903 Remove station (cancelled)
1905 Dredge river channel under bridge 307
1908 Construct industry track
1909 Construct a standard portable stock chute, and place a car body to serve as a depot
1911 Construct spur track 885 feet long
1911 Remove Farmers Co-Operate Union Co spur track
1912 Construct 4000 foot passing track
1913 Install steel in bridge 306
1916 Extend Mohler Union Warehouse Spur
1921 Install cattle guard in ROW fence
1926 Install curverts
1926 Sale of property
1929 Install section house from Withrow
1932 Repair flood damage-Mohler to Adrian
1933 Extend section house
1937 Install steel in bridges 308 and 314
1940 Install crossing signs
1942 Move public crossing
1943 Retire cinder platform
1943 Install electric lights in section house
1948 Replace culverts at MP 1535.45 and 1535.39
1949 Construct dike at bridge 308
1952 Remove section facilities (cancelled)
1954 Retire station facilities
1954 Construct Inland Chemical Spur