Photographer unknown.
April 11, 1938
A gate body casting for the elevation 934 outlet works, ready for shipment to the dam. This casting weighs approximately 19-1/2 tons, and was manufactured by the Hardie-Tynes Co. Birmingham, Alabama.
Pre-manufactured drop gate for the outlet works to shut off water flow to the power plant.
No comments:
Post a Comment