May 5, 2017
Eastern Washington Gateway Railroad was
on the move as numerous, heavily charged electrical storms brewed,
collided and moved through Central and Eastern Washington during the
night of Thursday (Thor’s Day) May 4th and into small hours of
Friday the 5th. Though I myself was not working, I decided to forgo
sleep and exploit the opportunity to follow my colleagues Engineer
Ted Curphey and Conductor Gary Durr headlong – literally – into
the storm(s) to bag some lightning-train images. Early on it seemed I
had made a bad bargain: a previous storm had petered out. Then, as
the crew began setting out empties at Almira (scene at hand), a
fierce storm began exploding on the near South-Southwest horizon.
Lightning flashes could be measured less than seconds apart.
Thousands of mostly horizontal intracloud and many vertical,
negatively charged immixed with unmistakable positively charged
cloud-to-ground strikes illuminated the ominous atmosphere in
paroxysms of divine flash bursts. Later, at Hanson, Ted brings the
train into the longest tangent on the line as an intracloud and a
stepped leader bolt discharge from Thor's Mjölnir. Yet there are
just a few rain drops. I am dry though the air is noticeably
electrified. Image made, I’m en route to the next station of
Hartline and then all Hell breaks loose as the skies open and a
deluge of biblical proportions with golf ball sized hailstones is
unleashed. Wipers: unable to keep up. Fusilladed: like the business
end of a 50 cal. Lightning: strobing in rapid succession. I am forced
to a crawl but make into Hartline before Ted and the train - itself
sustaining numerous strikes - where the inclemency finally subsides
nearly an hour later.
No comments:
Post a Comment